News

Web MPU Force W
2026-08-13 08:30:00

FORCE W delivers a straightforward boiler replacement at St John’s College, Cambridge


When a boiler failed at St John’s College, Cambridge, the priority was to restore reliable heating with a replacement that could be integrated into the existing plant room without an unnecessarily involved installation.

The Ferroli FORCE W was selected because its compact, wall-hung design and flexible controls offered a practical route to replacing the failed unit while retaining the other boilers already in place. That expectation was borne out on site: installation and set-up were both straightforward, helping to minimise disruption for the College.

A flexible solution for an existing plant room

The installation demonstrates an important advantage of the FORCE W: it can form part of a carefully designed mixed-manufacturer plant arrangement, rather than requiring every existing boiler to be replaced at the same time.

The FORCE W is designed for single or modular operation and can be installed in cascade configurations up to 600 kW. Its control options include a 0–10 V DC input together with Modbus and OpenTherm communication protocols, giving system designers useful flexibility when integrating the boiler with external controls and existing plant. As with any mixed-manufacturer cascade, compatibility and the control strategy should be confirmed for the individual system.

Available in outputs from 60 to 150 kW, the FORCE W combines a high-efficiency aluminium-silicon heat exchanger with a premix metal-fibre burner. It is suitable for natural gas or LPG and achieves Class 6 NOx performance under EN 15502-1.

Straightforward installation, successful outcome

By selecting a boiler suited to the constraints of the existing installation, the project avoided a more complex replacement programme. Commissioning was straightforward and the new FORCE W now operates alongside the retained plant.

“We chose the FORCE W because we felt the installation would be less involved, and this proved to be the case. Set-up was very straightforward and the client is very happy.”

The result is a pragmatic, efficient upgrade that restored heating performance while making good use of the serviceable equipment already in place.

MORE CONFIDENCE BUILT IN.

Now with a NEW 5-year parts & labour warranty*

Ferroli FORCE W combines high-performance commercial heating with flexible installation, intelligent controls and the reassurance of enhanced warranty protection.

Designed for individual or modular installations, FORCE W provides a flexible solution for a wide range of commercial heating projects.

*Terms and conditions apply. Please contact Ferroli for full warranty details.


At a glance

·       Site: St John’s College, Cambridge

·       Application: Replacement of a failed commercial boiler

·       Product: Ferroli FORCE W wall-hung condensing boiler

·       Key requirement: Straightforward integration with retained, mixed-manufacturer plant

·       Outcome: Simple installation and set-up, with a satisfied client

IDEAL FOR

Commercial Buildings • Education • Healthcare • Hotels & Leisure • Housing Developments


GOT A COMMERCIAL PROJECT COMING UP?

Talk to Scott about how Force W could work for your next installation.

CONTACT SCOTT

Scott Dunn |  National Commercial Sales Manager
07970 938920 |  scott.dunn@ferroli.com